Countdown
ISRO Shukrayaan-1 Venus Orbiter Launch
Wednesday, March 29, 2028 · 510 days away
Countdown
ISRO Shukrayaan-1 Venus Orbiter Launch
Reminders
Event overview
India's first Venus mission launches; 112-day cruise.
- Date
- 2028-03-29
- Country / jurisdiction
- India
- Region
- India
- Category
- Space
- Status
- scheduled
Confirmation checklist
Before you act on this countdown
Date signal
Local time
Calendar action
Next useful path
Source trail
Source trail for ISRO Shukrayaan-1 Venus Orbiter Launch
Primary source
en.wikipedia.org
Last reviewed
2026-04-30
Tracker status
scheduled
Date precision
Single-date event without a reliable public start time; date-first countdown only.
Schema posture
Event structured data is emitted because the record is single-date and scheduled or confirmed.
Primary citation
Freshness and review
Operational detail
Weak-date handling
What this countdown tracks
Departure of Shukrayaan-1, India's first dedicated Venus orbiter. The spacecraft is expected to launch on an LVM-3 from Sriharikota and begin a roughly 112-day heliocentric cruise to Venus. Its brief is to probe the atmosphere, surface and plasma environment of the inner planet with a mix of Indian-built and international payloads.
Background
The Venus Orbiter Mission, branded Shukrayaan-1, was approved by the Union Cabinet in September 2024 with a budget of ₹1,236 crore and a nominal launch set for 29 March 2028. ISRO narrowed the opportunity using launch windows that minimise delta-v and cruise time; the March 2028 slot yields an arrival in July of the same year. The carrier is expected to be an LVM-3 — the first interplanetary use of India's heaviest operational launcher — with the possibility of a Super Heavy Lift Vehicle substitution depending on readiness. LVM-3 has flown only eight missions as of 2025, including the Chandrayaan-2 and Chandrayaan-3 launches and the OneWeb commercial deployments.
Payload candidates include a Venus Synthetic Aperture Radar (VSAR) for sub-cloud surface mapping, a Venus Thermal Camera, the VARTISS solar-X-ray spectrometer, a radio-occultation experiment, and an ionospheric electron-temperature analyser. International partners have contributed in earlier phases; a Swedish ion-composition analyser from the Swedish Institute of Space Physics and a French IR spectrometer from LATMOS have been publicly discussed, alongside German contributions on the Venus Ionospheric and Solar wind particle Analyser. Mission objectives include mapping surface topography below the sulfuric acid cloud deck, studying atmospheric dynamics and super-rotation that sees the upper atmosphere rotate 60 times faster than the solid planet, and characterising solar-wind interaction in the absence of a Venusian magnetic field. The orbiter targets a highly elliptical insertion around 500 × 60,000 km to balance close observation and long-duration coverage. The spacecraft bus draws on the Mangalyaan and Chandrayaan heritage with solar-array sizing adjusted for the 0.72 AU flux.
Why the date matters
29 March 2028 is governed by orbital mechanics — Earth–Venus launch windows recur only every 19 months due to the relative synodic period of the two planets, and missing this one would push Shukrayaan deep into 2029 or beyond. The date also falls in an interplanetary cadence where NASA's DAVINCI and VERITAS missions are preparing for their own Venus arrivals later in the decade, giving Indian data natural comparison points. A clean launch keeps India on schedule for a coordinated multi-mission Venus science era.
What to watch for
- Final LVM-3 configuration confirmation for the interplanetary trajectory, including CE-20 upper-stage restart performance.
- Trans-Venus injection burn and cruise telemetry during the first 48 hours.
- Deployment status of VSAR and thermal camera booms, a historical failure mode on deep-space missions.
- Payload commissioning milestones during the 112-day cruise phase.
- Participation of international instruments and data-sharing agreements with ESA, CNES, SNSA and DLR.
- Navigation updates from ISTRAC and Deep Space Network at Byalalu.
- Readiness for Venus Orbit Insertion scheduled for 19 July 2028.
- Fuel-margin reports following trans-Venus injection, which will govern any extended mission.
- Parallel preparation of backup launch windows in case of March slippage.
Who's affected
Shukrayaan-1 is the most expensive interplanetary mission India has funded to date at ₹1,236 crore, more than twice Mangalyaan's ₹450-crore budget. Roughly 200 scientists across Physical Research Laboratory Ahmedabad, Space Applications Centre Ahmedabad, URSC Bengaluru and partner universities are working on instruments or science analysis. International partners committed to co-investigator seats on specific payloads will gain priority data access under negotiated timelines. The mission is also a test bed for ISRO's Gaganyaan-era deep-space communications upgrades, including the 32-metre Byalalu antenna refit completed in 2024.
Related events to track
Launch pairs with Shukrayaan Venus orbit insertion 112 days later, and shares LVM-3 scheduling with Chandrayaan-4 and BAS-01 module launch.
FAQ
When exactly is the Shukrayaan-1 launch? ISRO's planning date is 29 March 2028, set by the Earth–Venus transfer window derived from the synodic cycle.
Is Shukrayaan-1 confirmed or expected? Confirmed through Cabinet approval in September 2024; specific launch date remains subject to vehicle readiness and payload integration schedule at Sriharikota.
Who is responsible for Shukrayaan-1? ISRO, with instruments and subsystems supplied by Indian labs and international partners including Swedish and French agencies; mission operations run from URSC and ISTRAC Bengaluru.
Where can I read the official announcement? isro.gov.in press releases, the PIB Cabinet note of September 2024, and the Wikipedia entry at en.wikipedia.org/wiki/Venus_Orbiter_Mission.
Date confidence
Scheduled date
ISRO Shukrayaan-1 Venus Orbiter Launch is tracked as a scheduled event. The date is suitable for countdown and calendar use, while final logistics should still be checked against the linked source.
Source
https://en.wikipedia.org/wiki/Venus_Orbiter_Mission- Source host
- en.wikipedia.org
- Date precision
- Single scheduled date from the linked source
- Schema posture
- Event startDate emitted because the record is single-date and scheduled/confirmed
- Planning boundary
- Use as a monitoring aid until the source trail is stronger
Structured data posture
This page emits Event structured data because the tracked record has a single scheduled or confirmed date. The linked source remains the final reference for time, venue, and operational changes.
Countdown evidence
Retention class
Date-first scheduled countdown
Evidence score
5/10 record signals
City-page readiness
Held to date-first
- Evidence score5/10 signals present
- primary source URL; tracked date; schema-safe date; place context; related event cluster
- Date and schemaSchema-safe single date
- Single-date event without a reliable public start time; date-first countdown only. Event structured data is emitted because the record is single-date and scheduled or confirmed.
- Local-time readinessDate-first only
- The record is not used as a city-local event page until it has a reliable time, timezone, and non-windowed date.
- Record completeness1 concrete fields
- country India
- Weak-field watchlist4 fields to improve
- verified public start time; venue; manual official-source note; historical sequence
- Source freshnessen.wikipedia.org; reviewed 2026-04-30
- Related crawl path: Simhastha Kumbh Mela Ujjain 2028, Ugadi 2028, Ram Navami 2028, Simhastha Ujjain — First Shahi Snan (Chaitra Purnima).
Planning notes
How to use this ISRO Shukrayaan-1 Venus Orbiter Launch countdown
Date confidence
What could change
Local-time usefulness
Category context
Catalog-specific details
Series and expectation notes
Priority note
Verification trail
Record completeness
Related crawl path
Source reviewed Apr 30, 2026. The countdown record is intentionally labeled as scheduled or expected; use the source link and any range notes before treating the date as final.
Live values rendered at Nov 5, 7:07 PM UTC.
Related planning pages
Related countdowns
Explore nearby events
December Solstice 2027
NASA Dragonfly Launch to Titan
Simhastha Kumbh Mela Ujjain 2028
Ugadi 2028
UK Building Safety Regulator 2-Year Review
Ram Navami 2028
People also ask
When exactly is the Shukrayaan-1 launch?
Is Shukrayaan-1 confirmed or expected?
Who is responsible for Shukrayaan-1?
Where can I read the official announcement?
